What to write beside a budget miss, line by line, on one demo company's August. Each example gives the size, the cause and what happens next.
What good commentary says
Three things, in this order: how big the gap is, what caused most of it, and what happens next. Two sentences usually do it.
Write it from the split, after the figures are checked against the ledger. Every cause you name should match a figure the reader can find.
Revenue
The figures: $8.42M against a $9.15M budget, $0.73M or 8% short. Price +$0.18M, volume −$0.62M, mix −$0.12M, FX −$0.17M.
"Revenue was $0.73M under budget. We sold about 7% fewer units than planned, which cost $0.62M, and higher prices gave back $0.18M. Direct sales account for about half the gap."
Revenue gap to budget, August, $M
Volume explains most of the $0.73M.
| $M | |
|---|---|
| Budget | 9.15 |
| Price | +0.18 |
| Volume | −0.62 |
| Mix | −0.12 |
| Exchange rates | −0.17 |
| Actual | 8.42 |
Gross profit
The figures: $3.12M against $3.48M, $0.36M short. The margin was 37.1% against a 38.0% budget.
"Gross profit was $0.36M under budget. Lower revenue at the budget margin explains $0.28M. The other $0.08M comes from a margin of 37.1% against 38.0%."
Operating costs
The figures: $1.90M against $1.95M, $0.05M under budget.
With a threshold of $0.10M and 5%, this line needs no explanation. One sentence is enough:
"Operating costs were $0.05M under budget, within the threshold."
EBITDA
The figures: $1.22M against $1.53M, $0.31M short. Lower revenue −$0.28M, lower margin −$0.08M, operating costs +$0.05M.
"EBITDA was $0.31M under budget. Lower revenue explains $0.28M and a thinner margin $0.08M, partly offset by $0.05M of lower operating costs. Full-year revenue is now heading for $103.5M against a $108.0M budget."
EBITDA bridge, August, $M
Lower revenue explains most of the gap.
| $M | |
|---|---|
| Budget EBITDA | 1.53 |
| Lower revenue | −0.28 |
| Lower margin | −0.08 |
| Operating costs | +0.05 |
| Actual EBITDA | 1.22 |
A weak line, fixed
Weak: "Revenue was below budget due to market conditions and timing."
It gives no size, names no cause anyone can check, and says nothing about next month.
Better: "Revenue was $0.73M under budget, mostly because we sold about 7% fewer units than planned. If volume stays 7% short, the rest of the year moves with it."
Common mistakes
No number
A sentence without the size can't be ranked against the others.
Restating the table
The row already shows actual and budget. Say why they differ.
Timing, every month
If it is timing, name the month it lands in. Then check that it did.
A cause nobody can trace
Each cause should match a figure in the split.